AVTOVAZ – Modernization of the automatic AR16 engine assembly line
COMPANY
OOO AVTOVAZ
Year
2022
Category
Modernization
About the Project
Project Duration: 12 months
Equipment / System:
The line is designed for internal combustion engine (ICE) assembly. At this station, the cylinder head is automatically installed onto the engine block using a portal system.
Scope of work completed:
-
Engineering design
-
Replacement of the S5 control system with S7
-
Replacement of portal servo drives and motors
-
Installation and commissioning
project gallery
CONTACT US
You can fill out a detailed form if you already know all the details of the project
Or just leave your contact details and we will contact you to clarify all the details