AVTOVAZ - METALLINE. XJO Lot 3
COMPANY
AVTOVAZ
Year
2019
Category
All Inclusive Solutions
About the project
Length of the project : 2 Years
Description:
Equipment for upgrading the conveyor system of the body assembly line
Scope of work completed:
-
Restoration of a 2015 line.
-
Line composition: main line, repair line, second and third repair lines, skip return line.
-
Design/Engineering
-
Fabrication
-
Installation of equipment for mounting hanging parts for XJO models (gauges, manipulators, VIN number marking)
-
Automation of the entire line.
project gallery
CONTACT US
You can fill out a detailed form if you already know all the details of the project
Or just leave your contact details and we will contact you to clarify all the details